01/09/2025 - Interim Contract Direct Award – Provision for Supply, Testing, Inspection & Repair of Fire Extinguishing Installations & Equipment ref: 5531    Recommendations Approved

Part A: Requirement for an exemption under rule 21.3 (j) “Where continued provision of Supplies, Works or Services is required for an additional period and this can be justified, for example where a service review includes the intention to co-terminate relevant Contracts within a reasonable period with all exceptional circumstances to be objectively evidenced in the exemption request to enable the decision maker to reach an informed and reasonable decision in the circumstances.” of the Contract Procedure Rules (CPRs) to waive the procurement procedures under rule 4 of the CPRs, which would enable a direct award of a contract to be considered under Part B.

Part B: Subject to approval of the proposed exemption under Part A, appoint Walker Fire (UK) Ltd.to provide Provision for Supply, Testing, Inspection & Repair of Fire Extinguishing Installations & Equipment on Council assets for a period of 12 months.

Decision Maker: Executive Director Health & Care (Deputy Chief Executive)

Decision published: 28/04/2026

Effective from: 01/09/2025

Decision:

RESOLVED - That:
Part A
In accordance with rule 21.3 (j) of the Contract Procedure Rules, approve:

an exemption to the procurement procedures prescribed under rule 4 of the Contract Procedure Rules to allow for a direct contract award without competition to be made to Walker Fire (UK) Ltd. to deliver those services detailed in this report.

Part B
Subject to the approval of the requested exemption under Part A,
1.
To directly appoint and to enter into a contract with Walker Fire (UK) Ltd. for a period of 12 months for Provision for Supply, Testing, Inspection & Repair of Fire Extinguishing Installations & Equipment on Council assets with a maximum contract value of £150,000 including VAT.
2.
Approve the budget required for the proposed 12-month period
3.
Approve the appointment of Walker Fire (UK) Ltd. and authorise the completion of necessary contract documentation, so that the Council can enter into a Contract with Walker Fire (UK) Ltd. for the proposed Contract.
4.
Delegate authority to the Borough Solicitor to carry out all necessary legal formalities.

Lead officer: Ian Foy


01/09/2025 - Interim Contract Direct Award – Provision of Water Quality Services for the Control of Legionella including Sampling, Subsequent Reporting, Treatment & Maintenance of Water Systems ref: 5537    Recommendations Approved

Part A: Requirement for an exemption under rule 21.3 (j) “Where continued provision of Supplies, Works or Services is required for an additional period and this can be justified, for example where a service review includes the intention to co-terminate relevant Contracts within a reasonable period with all exceptional circumstances to be objectively evidenced in the exemption request to enable the decision maker to reach an informed and reasonable decision in the circumstances.” of the Contract Procedure Rules (CPRs) to waive the procurement procedures under rule 4 of the CPRs, which would enable a direct award of a contract to be considered under Part B.
Part B: Subject to approval of the proposed exemption under Part A, appoint Pure-Tech (UK) Ltd.to provide Provision of Water Quality Services for the Control of Legionella including Sampling, Subsequent Reporting, Treatment & Maintenance of Water Systems on Council assets for a period of 12 months.

Decision Maker: Executive Director Health & Care (Deputy Chief Executive)

Decision published: 19/12/2025

Effective from: 01/09/2025

Decision:

RESOLVED - That:
Part A

In accordance with rule 21.3 (j) of the Contract Procedure Rules, approve:
an exemption to the procurement procedures prescribed under rule 4 of the Contract Procedure Rules to allow for a direct contract award without competition to be made to Pure-Tech (UK) Ltd.to deliver those services detailed in this report.

Part B
Subject to the approval of the requested exemption under Part A,
1.
To directly appoint and to enter into a contract with Pure-Tech (UK) Ltd. for a period of 12 months for Provision of Water Quality Services for the Control of Legionella including Sampling, Subsequent Reporting, Treatment & Maintenance of Water Systems on Council assets with a maximum contract value of £40,000 including VAT.
2.
Approve the budget required for the proposed 12-month period
3.
Approve the appointment of Pure-Tech (UK) Ltd. and authorise the completion of necessary contract documentation, so that the Council can enter into a Contract with Pure-Tech (UK) Ltd. for the proposed Contract.
4.
Delegate authority to the Borough Solicitor to carry out all necessary legal formalities.

Lead officer: Ian Foy


01/09/2025 - Interim Contract Direct Award – Maintenance of Fire Alarm Systems ref: 5530    Recommendations Approved

Part A: Requirement for an exemption under rule 21.3 (j) “Where continued provision of Supplies, Works or Services is required for an additional period and this can be justified, for example where a service review includes the intention to co-terminate relevant Contracts within a reasonable period with all exceptional circumstances to be objectively evidenced in the exemption request to enable the decision maker to reach an informed and reasonable decision in the circumstances.” of the Contract Procedure Rules (CPRs) to waive the procurement procedures under rule 4 of the CPRs, which would enable a direct award of a contract to be considered under Part B.

Part B: Subject to approval of the proposed exemption under Part A, appoint Guardian Technical Maintenance Ltd.to provide Maintenance of Fire Alarm Systems on Council assets for a period of 12 months.

Decision Maker: Executive Director Health & Care (Deputy Chief Executive)

Decision published: 26/09/2025

Effective from: 01/09/2025

Decision:

RESOLVED - That:
Part A
In accordance with rule 21.3 (j) of the Contract Procedure Rules, approve:

an exemption to the procurement procedures prescribed under rule 4 of the Contract Procedure Rules to allow for a direct contract award without competition to be made to Guardian Technical Maintenance Ltd.to deliver those services detailed in this report.
Part B
Subject to the approval of the requested exemption under Part A,
1.
To directly appoint and to enter into a contract with Guardian Technical Maintenance Ltd. for a period of 12 months for Maintenance of Fire Alarm Systems on Council assets with a maximum contract value of £80,000 including VAT.
2.
Approve the budget required for the proposed 12-month period
3.
Approve the appointment of Guardian Technical Maintenance Ltd. and authorise the completion of necessary contract documentation, so that the Council can enter into a Contract with Guardian Technical Maintenance Ltd. for the proposed Contract.
4.
Delegate authority to the Borough Solicitor to carry out all necessary legal formalities.

Lead officer: Ian Foy


01/09/2025 - Interim Contract Direct Award – Maintenance of Building Energy Management Systems (BEMS) ref: 5528    Recommendations Approved

Part A: Requirement for an exemption under rule 21.3 (j) of the Contract Procedure Rules (CPRs) to waive the procurement procedures under rule 4 of the CPRs, which would enable a direct award of a contract to be considered under Part B.

Part B: Subject to approval of the proposed exemption under Part A, appoint E.On Control Solutions Ltd. to provide Maintenance of Building Energy Management Systems (BEMS)on Council assets for a period of 12 months.

Decision Maker: Executive Director Health & Care (Deputy Chief Executive)

Decision published: 26/09/2025

Effective from: 01/09/2025

Decision:

RESOLVED - That:
Part A
In accordance with rule 21.3 (j) of the Contract Procedure Rules, approve:
An exemption to the procurement procedures prescribed under rule 4 of the Contract Procedure Rules to allow for a direct contract award without competition to be made to E.On Control Solutions Ltd. to deliver those services detailed in this report.

21.3(j) Where continued provision of Supplies, Works or Services is required for an additional period and this can be justified, for example where a service review includes the intention to co-terminate relevant Contracts within a reasonable period with all exceptional circumstances to be objectively evidenced in the exemption request to enable the decision maker to reach an informed and reasonable decision in the circumstances.

Part B
Subject to the approval of the requested exemption under Part A,
1.
To directly appoint and to enter into a contract with E.On Control Solutions Ltd. for a period of 12 months for Maintenance of Building Energy Management Systems (BEMS)on Council assets with a maximum contract value of £50,000.
2.
Approve the budget required for the proposed 12-month period
3.
Approve the appointment of E.On Control Solutions Ltd. and authorise the completion of necessary contract documentation, so that the Council can enter into a Contract with E.On Control Solutions Ltd. for the proposed Contract.
4.
Delegate authority to the Borough Solicitor to carry out all necessary legal formalities.

Lead officer: Ian Foy


01/09/2025 - Gloucester Street North / Radnor Street, Werneth – Proposed Prohibition of Waiting ref: 5525    Recommendations Approved

The Highway Regulation Committee considered a report on several objections received to the proposed extension of the existing Prohibition of Waiting restrictions on Gloucester Street North / Radnor Street, Werneth. A report recommending the extension of the existing Prohibition of Waiting on Gloucester Street North / Radnor Street, Werneth, was approved under delegated powers on 18 June 2024. The proposal was subsequently advertised, four objections were received.
A copy of the approved report was attached in Appendix A and copies of the objections were attached in Appendix B.

Decision Maker: Director of Environment

Decision published: 12/09/2025

Effective from: 01/09/2025

Decision:

RESOLVED - That:
in accordance with the recommendation of the Highways Regulation Committee of 19 June 2025, that the objection be dismissed, and the original proposal (as advertised) be introduced as detailed in the drawing and plan in the Highway Regulation Committee Report approved under delegated powers on 19 June 2025

Lead officer: Jeannette Whitney


29/08/2025 - Funding Laptops for Integrated Childrens and Families Service ref: 5524    Recommendations Approved

Through a section 75 partnership agreement, approved at cabinet, the NHS NCA jointly deliver Oldham’s Integrated Children’s and Families service for the provision of Health Visiting, School Nursing and the specialist targeted team for vulnerable families. As part of this agreement, the Local Authority is responsible for the investment into IT equipment for staff including the provision of laptops.

Decision Maker: Cabinet Member - Adults, Health and Wellbeing

Decision published: 12/09/2025

Effective from: 20/09/2025

Decision:

RESOLVED - That: Through a section 75 partnership agreement, approved at cabinet, the NHS NCA jointly deliver Oldham’s Integrated Children’s and Families service for the provision of Health Visiting, School Nursing and the specialist targeted team for vulnerable families. As part of this agreement, the Local Authority is responsible for the investment into IT equipment for staff including the provision of laptops.

Lead officer: Anna Tebay


03/09/2025 - Proposed Prohibition of Waiting – Denshaw Road and Lodge Lane, Delph ref: 5519    Recommendations Approved

To consider the introduction of waiting restrictions on Denshaw Road and Lodge Lane, Delph.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 03/09/2025

Decision:

RESOLVED - That:
prohibition of waiting restrictions be introduced in accordance with the plan and schedule at the end of this report

Lead officer: Andy Cowell


27/06/2025 - Primary Data and Improvement Programme ref: 5522    Recommendations Approved

Permission is being sought to commission an external organisation to fulfil the specialist role of supporting schools to review and analyse data at key points across the primary phases, Early Years Foundation Stage Profile (EYFSP) and Key Stage 1 (KS1). This will include the facilitation of moderation activities to ensure consistency and accuracy in teacher assessment judgements across Oldham. In addition, the provider will deliver training and support to schools, focusing on key priorities identified through the 2025 national data submissions.

Decision Maker: Director of Education and Early Years

Decision published: 04/09/2025

Effective from: 27/06/2025

Decision:

RESOLVED - That:
To seek approval to commission an external organisation with the skills, knowledge and experience through an open quotation process to fulfil the specialist role to review and analyse data at key points throughout primary phases and provide moderation and training focused on key priorities to improve outcomes for children throughout their primary education for 1 year, but with the ability to extend the commission for a further year.

Lead officer: Emma Bennett


26/08/2025 - Speech and Language support for education settings across the Early Years Sector ref: 5521    Recommendations Approved

A decision is being sought to request approval for an exemption under Rule 21 of the Contract Procedure Rules (CPRs) to waive the requirement under Rule 4 of the CPRs to obtain 3 quotes. Subject to approval of the exemption, authority is then needed for the required budget and for a direct contract award to the Kingfisher Learning Trust to deliver training, support and coaching for the Better Communication Team.

Decision Maker: Executive Director Children and Young People (Director of Childrens Services)

Decision published: 04/09/2025

Effective from: 26/08/2025

Decision:

RESOLVED - That:
1. This report seeks firstly seeks an approval under Rule 21 of the CPRs for an exemption to the requirement under Rule 4 to obtain 3 quotes for the required specialist coaching and training to improve outcomes for children in Oldham in speech, language and communication (“Services”). Subject to the approval of the exemption, approval is then needed for the budget and for from the Contract Procedure Rules to enable a direct contract award to be made to the Kingfisher Learning Trust for their specialist expertise to support the Better Communication Team in Oldham by providing the Services specialist coaching and training to improve outcomes for children in Oldham in speech, language and communication at a cost for 1 year.

Lead officer: Emma Bennett


03/09/2025 - Land adjacent to Rochdale Road/Middleton Road, Royton ref: 5520    Recommendations Approved

For the Council to update its list of highways maintainable at the public expense to include land adjacent to Middleton Road and Rochdale Road, Royton, which the Council has constructed and been maintaining for many years. Inclusion of this important town centre parcel of land in the list of highways maintainable by the Council will allow for more effective management of the area.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 03/09/2025

Decision:

RESOLVED - That:
The Council updates its list of highways maintainable at the public expense to include the land as shaded pink on plan at end of report.

Lead officer: Jeannette Whitney


03/09/2025 - Proposed Prohibition of Waiting – Wellington Road, Greenfield ref: 5518    Recommendations Approved

To consider the introduction of waiting restrictions on Wellington Road, Greenfield.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 03/09/2025

Decision:

RESOLVED - That:
'prohibition of waiting’ restrictions be introduced in accordance with the plan and schedule at the end of this report.

Lead officer: Andy Cowell


03/09/2025 - Fir Bank Primary School, Grasmere Road, Royton ref: 5517    Recommendations Approved

The purpose of the report is to consider the introduction of short lengths of ‘no waiting’, 8am – 6.30pm, restrictions and the extension to the ‘School Keep Clear’ markings along Grasmere Road, outside Fir Bank Primary School.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 03/09/2025

Decision:

RESOLVED - That:
The preferred option is Option 1

Lead officer: Jeannette Whitney


21/08/2025 - Pennine Bridleway National Trail Maintenance ref: 5516    Recommendations Approved

The Council has successfully secured 100% Grant funding from Natural England, via the Yorkshire Dales National Park Authority (YDNPA), to deliver an expansion to an existing maintenance scheme on a section of the Pennine Bridleway National Trail.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 21/08/2025

Decision:

RESOLVED - That:
To accept the YDNPA grant funding and approve the delivery of (Phase 2) of the scheme also detailed in this report.

Lead officer: Liam Kennedy


21/08/2025 - Highway Structure Inspections ref: 5515    Recommendations Approved

This report seeks delegated approval to appoint an engineering consultant to undertake 125 no. inspections of highway structures around the borough.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 21/08/2025

Decision:

RESOLVED - That:
1. To approve the highway structures inspections project; and
2. To approve the direct award of RSK Environment Limited via the ESPO Framework Agreement, Lot 5 Highways, Traffic and Transport and for the Council to enter into a contract with RSK Environment Limited under the Framework Agreement.

Lead officer: Hamish Dunlop


02/09/2025 - Bus Stop Clearways – Various Locations ref: 5514    Recommendations Approved

At these locations, bus passengers can step out into the carriageway between parked vehicles and vehicles for loading, in order to be seen by the driver. Parking at these locations also affects traffic movements and visibility along the roads concerned.
If approved, the proposal would enable passengers to board and alight buses safely and improve safety for motorists using the roads.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 02/09/2025

Decision:

RESOLVED - That:
Bus Stop Clearways be introduced in accordance with the plans and schedules at the end of this report

Lead officer: Shahed Chaudhary


07/08/2025 - Haven Lane Traffic Calming and 20mph Zone ref: 5513    Recommendations Approved

The 20mph speed limit and traffic calming measures proposed relate to an original scheme associated with condition 17 of planning application PA/338917/16. The revised traffic calming scheme being progressed here is required to accommodate unknown site constraints which is being processed via a variation of condition 17 under VAR/352405/24
If the proposals are not supported the developer cannot fulfil their obligations under the Section 106 agreement

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 07/08/2025

Decision:

RESOLVED - That:
the proposals contained within this report are supported and the proposed speed reduction and traffic calming measures be introduced

Lead officer: Jeannette Whitney


02/09/2025 - Crime Lane, Prohibition of Driving ref: 5512    Recommendations Approved

The purpose of this report is to consider the implementation of a permanent Prohibition of Driving on Crime Lane to prevent extensive fly tipping.

Decision Maker: Director of Environment

Decision published: 04/09/2025

Effective from: 02/09/2025

Decision:

RESOLVED - That:
the Council implements a gated Prohibition of Motor Vehicles Traffic Regulation Order on both ends of Crime Lane, to stop the fly tipping problem. The scheme will introduce an electronically operated gate at the junction with Knott Lanes, that will be operated by means of an app, key fob and/or pin code number.
At the Stannybrook Road end of the lane, it is proposed that access to the lane is prevented by use of concrete barriers, which will need to be spaced to allow access for pedestrians and equestrians. The barriers would be located to maintain the private access to the field.

Lead officer: Jeannette Whitney


15/08/2025 - Approval to award a 12 month contract for a breast feeding support app ref: 5505    Recommendations Approved

As part of the Family Hubs programme, the theme of infant feeding includes funding for a breast-feeding support app which would be accessible 24/7 for families. The proposed app offers comprehensive support to families from conception through the first two years of a
child’s life – the first 1001 days.

Decision Maker: Executive Director Children and Young People (Director of Childrens Services)

Decision published: 02/09/2025

Effective from: 15/08/2025

Decision:

RESOLVED - to award a 12 month contract to the most economically advantageous provider (Anya) to provide a breastfeeding support App.

Lead officer: Bruce Penhale


18/08/2025 - Exemption from Contract Procedure Rules in order to invest in and enter a licence agreement for the Essential Parent App ref: 5508    Recommendations Approved

The purpose of the report is to request approval to invest in the Essential Parent (EP) Family Hub App that has recently been developed with GMCA and the GM localities. The investment will allow Oldham to provide all parents with a free at the point of use app that supports families from pregnancy through to 19 years (or 25 years for young people with additional needs). The app translates all articles into a parent’s chosen
language (75 languages available). The App forms part of Oldham’s emerging digital offer for families and young people from pregnancy to 25 years of age.

Decision Maker: Executive Director Children and Young People (Director of Childrens Services)

Decision published: 02/09/2025

Effective from: 18/08/2025

Decision:

RESOLVED - That: exemption be approved from the Procurement Procedure Rules and invest in the Essential Parent app with a three year contract.

Lead officer: Bruce Penhale


15/08/2025 - Grant Award to Homestart Host to Expand Existing Services ref: 5507    Recommendations Approved

Homestart Host are a respected partner organisation who deliver a variety of services across the borough to offer early support to families. They offer services such as, Infant Feeding Peer Support, Play Learn Grow, Genetic Outreach, Dad Matters and the Befriending Service.

The Family Hubs grant provided to the council by DfE provides an opportunity to enter into a grant agreement with Homestart to enable them to enhance some of the services they deliver in areas where we know families would most benefit. Enhancing Play, Learn, Grow and increasing bilingual support within services will have a positive impact on our most vulnerable families. Homestart have a high success rate engaging
with families as they use a peer support model. Harder to engage families are often more willing to work with peers than professionals. Providing support in community languages will encourage BAME families to take up the support they require earlier, thus preventing escalation to higher
cost, more intensive services further down the line.

Decision Maker: Executive Director Children and Young People (Director of Childrens Services)

Decision published: 02/09/2025

Effective from: 15/08/2025

Decision:

RESOLVED - To approve the award of grant funding of £50,000 to Homestart Host to enable them to enhance Play, Learn, Grow across the borough and to build on their bilingual support offer to encourage more BAME families to access targeted early help support. The grant would run from 1 September 2025 to 31 August 2026, with an option to extend for
a further one year up until 31 August 2027 should funding be available and it be identified that there is still a need across the borough. Funding will be from the DfE Family Hubs Grant, with no additional cost to the council.

Lead officer: Bruce Penhale


24/07/2025 - Additionally Resourced Provision (ARP) - Northmoor Academy Primary School (Harmony trust) ref: 5511    Recommendations Approved

The LA currently has circa £8.3 M of High Needs Provision Capital Allocations Funding. A number of projects were approved in 2024, and these have now been completed and are operating effectively and offering additional places for children with additional needs in improved and purpose-built learning environments.

We are continuing to develop a number of major projects (those costing over 250k) and these will be the subject of a Cabinet Report in June 2025. This report is focused on and seeks approval for two lower cost projects that can be quickly delivered.

Decision Maker: Cabinet Member - Education and Skills

Decision published: 22/08/2025

Effective from: 30/08/2025

Decision:

RESOLVED - That approval be granted to issue grant funding from the HNPCA Capital Fund to the schools listed in order to enhance provision for pupils with SEND and additional needs.

Lead officer: Andy Collinge